Hamilton-Wentworth Catholic District School Board

Bishop Ryan Catholic Secondary School, Hamilton, ON

New construction 2-story, 190,600 square-foot 9-12 secondary school.

  • Three condensing gas fired heating boilers
  • One glycol/hot water converters
  • Four gas fired humidifiers
  • Two gas fired domestic water heaters with recirculating water pump
  • Four instantaneous gas fired domestic water heaters
  • Three air cooled screw chillers
  • One dry fluid cooler with plate heat exchanger for winter free cooling
  • Variable flow hot and chilled water distribution systems
  • Eighty-nine heating/cooling fan coil units (four-pipe)
  • Four dedicated variable outdoor air volume fan systems with energy recovery wheel
  • Variable air volume terminal units with CO2 sensors for ventilation control
  • Two gas fired make-up air units
  • Four heat/cool rooftop systems (single zone constant air volume)
  • Seven heat/cool rooftop systems (single zone variable air volume)
  • One networked air conditioning split system
  • Ten ductless split systems
  • Trane building automation system

St. Gabriel Catholic Elementary School, Stoney Creek, ON

New construction 2-story, 57,300 square-foot JK-8 elementary school.

  • Two condensing gas fired heating boilers
  • One glycol/hot water converter
  • One gas fired humidifier
  • One gas fired domestic water heaters with recirculating water pump
  • One variable flow air cooled screw chiller
  • Variable flow hot and chilled water distribution systems
  • Twenty-seven heating/cooling fan coil units (four-pipe)
  • One dedicated variable outdoor air volume fan system with energy recovery wheel
  • Variable air volume terminal units with CO2 sensors for ventilation control
  • One heat/cool rooftop systems (single zone constant air volume)
  • Two heat/cool rooftop systems (single zone variable air volume)
  • Tridium Niagara building automation system (Honeywell Spyder Controls)