Halton District School Board

Dr. Frank J. Hayden Secondary School, Burlington ON

New construction 3-story, 208,900 square-foot 9-12 secondary school, community centre and library.

  • Two non-condensing gas fired heating boilers
  • Five gas fired domestic water heaters with recirculating water pumps
  • Hot water distribution system
  • Radiant floor heating system
  • Seven fan powered variable air volume terminal units
  • A thermo active building system (TABS) to heat and cool classrooms, administration and library
  • TABS combine high efficiency rooftop equipment with pre-cast concrete slabs
  • Seven heat/cool rooftop units recirculate air through the hollow cores of pre-cast concrete slabs
  • Two variable air volume heat/cool rooftop systems supply air to fan powered terminal units
  • One constant volume heat/cool rooftop system serves variable volume-temperature dampers
  • Ten heat/cool rooftop systems (single zone constant air volume)
  • Two rooftop heating & ventilating systems
  • Two dedicated outdoor air handling units with energy recovery wheel
  • One gas fired make-up air unit
  • Delta Controls building automation system

Martin Street Public Elementary School, Milton

New construction 2-story, 76,100 square-foot JK-8 elementary school.

  • Two condensing gas fired heating boilers
  • One evaporative fluid cooler
  • One gas fired domestic water heater with recirculating water pump
  • Variable flow heat pump loop water distribution system
  • One dedicated outdoor air handling units with heat recovery pipe
  • Forty-nine heat pump units
  • One mixed air handling unit with gas-fired burner and DX cooling
  • Tridium Niagara building automation system (Distech Controls)